CM:

ATTN

Get the app

Tanakawu, Indonesia

13 memories from Tanakawu, Indonesia

The image depicts a scene at a Pertamina gas station in Tanakawu, Indonesia. Several vehicles, including motorcycles and a pickup truck, are lined up at the pumps, suggesting a queue. People are seated on or near their motorcycles, some wearing helmets. One person in the foreground is looking at their phone while seated on a motorcycle. The gas station canopy is visible overhead, with signage indicating fuel types such as "Pertamax Turbo" and "Solar." In the background, buildings and a satellite dish are present, indicating a developed area within the city. The ground is paved with concrete and tiles.

The image depicts a scene at a Pertamina gas station in Tanakawu, Indonesia. Several vehicles, including motorcycles and a pickup truck, are lined up at the pumps, suggesting a queue. People are seated on or near their motorcycles, some wearing helmets. One person in the foreground is looking at their phone while seated on a motorcycle. The gas station canopy is visible overhead, with signage indicating fuel types such as "Pertamax Turbo" and "Solar." In the background, buildings and a satellite dish are present, indicating a developed area within the city. The ground is paved with concrete and tiles.

Tanakawu
The image depicts a queue of vehicles at a gas station in Tanakawu, Indonesia. In the foreground, a person is seated on a red motorcycle with a blue bag slung over their shoulder. The motorcycle's license plate reads "DR 6408 TU 03-27". To the right of the motorcycle, a silver SUV is parked in line. Behind the motorcycle, other vehicles, including red cars, are visible, forming a queue. A gas pump is to the left of the motorcycle. In the background, trees and buildings can be seen. The sky is bright, suggesting it is daytime. The ground is paved with concrete.

The image depicts a queue of vehicles at a gas station in Tanakawu, Indonesia. In the foreground, a person is seated on a red motorcycle with a blue bag slung over their shoulder. The motorcycle's license plate reads "DR 6408 TU 03-27". To the right of the motorcycle, a silver SUV is parked in line. Behind the motorcycle, other vehicles, including red cars, are visible, forming a queue. A gas pump is to the left of the motorcycle. In the background, trees and buildings can be seen. The sky is bright, suggesting it is daytime. The ground is paved with concrete.

Tanakawu
The video shows a close-up view from inside an airplane looking out the window. The window frame is visible, and outside, the wing of a red airplane with a logo is partially seen. An airport tarmac with some orange cones and buildings in the background is also visible through the window. The primary focus of the video is a dead cockroach lying on its back on the window sill. The lighting suggests it is daytime, possibly early morning or late afternoon due to the warm glow.

The video shows a close-up view from inside an airplane looking out the window. The window frame is visible, and outside, the wing of a red airplane with a logo is partially seen. An airport tarmac with some orange cones and buildings in the background is also visible through the window. The primary focus of the video is a dead cockroach lying on its back on the window sill. The lighting suggests it is daytime, possibly early morning or late afternoon due to the warm glow.

Tanakawu
An empty wheelchair sits on a vast, gray asphalt surface, likely an airport tarmac, in Tanakawu, Indonesia. The wheelchair is positioned in the lower left quadrant of the image, facing slightly to the right, with its large rear wheels and smaller front casters clearly visible. Red markings, possibly runway or taxiway indicators, are visible in the mid-ground. The background is a hazy expanse, with a pale blue sky above, tinged with wispy clouds. The overall impression is one of desolation and stillness, with the lone wheelchair symbolizing absence or waiting.

An empty wheelchair sits on a vast, gray asphalt surface, likely an airport tarmac, in Tanakawu, Indonesia. The wheelchair is positioned in the lower left quadrant of the image, facing slightly to the right, with its large rear wheels and smaller front casters clearly visible. Red markings, possibly runway or taxiway indicators, are visible in the mid-ground. The background is a hazy expanse, with a pale blue sky above, tinged with wispy clouds. The overall impression is one of desolation and stillness, with the lone wheelchair symbolizing absence or waiting.

Tanakawu
The video shows a crowded outdoor area, likely an airport or transportation hub, with a long covered walkway. In the foreground, a man in a green shirt with a badge is pushing a white luggage cart. He is looking towards the camera. Behind him, a large group of people are gathered, many of whom appear to be waiting. Some are standing, while others are sitting on benches or the ground. The people are dressed in a variety of casual clothing, with many women wearing headscarves. Cars are visible on the left side of the frame, and a yellow sign with the words "DROP ZONE" is hanging from the covered walkway. The overall impression is one of a busy and possibly disorganized waiting area. The lighting suggests it is daytime, with sunlight casting shadows on the ground.

The video shows a crowded outdoor area, likely an airport or transportation hub, with a long covered walkway. In the foreground, a man in a green shirt with a badge is pushing a white luggage cart. He is looking towards the camera. Behind him, a large group of people are gathered, many of whom appear to be waiting. Some are standing, while others are sitting on benches or the ground. The people are dressed in a variety of casual clothing, with many women wearing headscarves. Cars are visible on the left side of the frame, and a yellow sign with the words "DROP ZONE" is hanging from the covered walkway. The overall impression is one of a busy and possibly disorganized waiting area. The lighting suggests it is daytime, with sunlight casting shadows on the ground.

Tanakawu
The image shows a close-up of a person's hand holding a smartphone. The phone displays a red screen with white text. The top of the screen shows the time "06.21" and a green dot indicating a camera. The text on the screen reads "WHISTLE BLOWING SYSTEM POLRI", and below that, "WHISTLE BLOWING SYSTEM (WBS) POLRI". Further down, there is smaller text that reads "WBS POLRI adalah SARANA INFORMASI INTERNAL DI LINGKUNGAN POLRI". At the bottom of the screen, the text "DASAR PROGRAM" is visible, along with a URL that appears to be "wbs.polri.go.id". The background is a blurry reddish-brown texture, possibly a surface or fabric. The location of Tanakawu, Indonesia, is not directly depicted or implied by the visual elements in the image.

The image shows a close-up of a person's hand holding a smartphone. The phone displays a red screen with white text. The top of the screen shows the time "06.21" and a green dot indicating a camera. The text on the screen reads "WHISTLE BLOWING SYSTEM POLRI", and below that, "WHISTLE BLOWING SYSTEM (WBS) POLRI". Further down, there is smaller text that reads "WBS POLRI adalah SARANA INFORMASI INTERNAL DI LINGKUNGAN POLRI". At the bottom of the screen, the text "DASAR PROGRAM" is visible, along with a URL that appears to be "wbs.polri.go.id". The background is a blurry reddish-brown texture, possibly a surface or fabric. The location of Tanakawu, Indonesia, is not directly depicted or implied by the visual elements in the image.

Tanakawu
A wide shot captures the Indonesian flag, red on top and white on the bottom, gently waving from a flagpole. The flagpole stands tall against a clear blue sky dotted with a few wispy clouds. Overhead, a series of parallel black wires crisscross the sky, creating a stark linear pattern. Lush green trees frame the bottom portion of the image, their branches reaching upwards towards the flag. The scene is bathed in bright sunlight, casting subtle shadows. There are no people visible in the frame.

A wide shot captures the Indonesian flag, red on top and white on the bottom, gently waving from a flagpole. The flagpole stands tall against a clear blue sky dotted with a few wispy clouds. Overhead, a series of parallel black wires crisscross the sky, creating a stark linear pattern. Lush green trees frame the bottom portion of the image, their branches reaching upwards towards the flag. The scene is bathed in bright sunlight, casting subtle shadows. There are no people visible in the frame.

Tanakawu
A person wearing a black hat and a striped shirt is shown from the side. They are holding a small object, possibly a knife, and appear to be scraping or cleaning a wooden surface that is attached to a concrete structure. The concrete structure is weathered and appears to be part of a wall or a building. The background shows a road, greenery, and a white fence. The lighting suggests it is daytime.

A person wearing a black hat and a striped shirt is shown from the side. They are holding a small object, possibly a knife, and appear to be scraping or cleaning a wooden surface that is attached to a concrete structure. The concrete structure is weathered and appears to be part of a wall or a building. The background shows a road, greenery, and a white fence. The lighting suggests it is daytime.

Tanakawu
The image depicts a murky pond filled with numerous green lily pads and several white lily buds. The water is dark and appears to be shallow, with visible mud at the bottom. Dead leaves are scattered across the surface of the lily pads and floating in the water. In the foreground, a cluster of lily pads surrounds a central mass of stems and leaves, from which the lily buds emerge. A red and white plastic bottle is visible floating among the lily pads in the upper right portion of the image. The overall scene suggests a natural aquatic environment. The location is identified as Tanakawu, Indonesia.

The image depicts a murky pond filled with numerous green lily pads and several white lily buds. The water is dark and appears to be shallow, with visible mud at the bottom. Dead leaves are scattered across the surface of the lily pads and floating in the water. In the foreground, a cluster of lily pads surrounds a central mass of stems and leaves, from which the lily buds emerge. A red and white plastic bottle is visible floating among the lily pads in the upper right portion of the image. The overall scene suggests a natural aquatic environment. The location is identified as Tanakawu, Indonesia.

Tanakawu
In Tanakawu, Indonesia, a man, viewed from behind, stands next to a motorcycle loaded with a bundle of rice stalks. He wears a straw hat, a patterned short-sleeved shirt, and a sarong with blue and brown stripes. His left hand holds a tool, possibly a knife, near the rice bundle. The motorcycle is parked on a dirt ground with scattered debris. A textured yellow wall with rectangular openings runs along the background, partially obscured by trees. A sign with text is visible above the wall. The environment appears to be outdoors, likely a rural or semi-rural area.

In Tanakawu, Indonesia, a man, viewed from behind, stands next to a motorcycle loaded with a bundle of rice stalks. He wears a straw hat, a patterned short-sleeved shirt, and a sarong with blue and brown stripes. His left hand holds a tool, possibly a knife, near the rice bundle. The motorcycle is parked on a dirt ground with scattered debris. A textured yellow wall with rectangular openings runs along the background, partially obscured by trees. A sign with text is visible above the wall. The environment appears to be outdoors, likely a rural or semi-rural area.

Tanakawu
In Tanakawu, Indonesia, a man in a white polo shirt is seated on a dark wooden bench, exhaling smoke from a cigarette. A plastic bag containing food items is placed on a black, reflective table in front of him. A smartphone and a pack of cigarettes are also visible on the table. The background consists of a yellow-painted wall with visible scuff marks and a white vertical object. The lighting suggests an indoor environment with natural light.

In Tanakawu, Indonesia, a man in a white polo shirt is seated on a dark wooden bench, exhaling smoke from a cigarette. A plastic bag containing food items is placed on a black, reflective table in front of him. A smartphone and a pack of cigarettes are also visible on the table. The background consists of a yellow-painted wall with visible scuff marks and a white vertical object. The lighting suggests an indoor environment with natural light.

Tanakawu
A man in a tan police uniform with a black beret holds a rifle. The man has a dark complexion, short dark hair, and is looking forward with a neutral expression. He is wearing a name tag that reads "SAPOAN AR" and a badge on his uniform. The man is standing in a room with yellow walls. To his left is a metal cabinet with drawers, and a window with metal bars. To his right are shelves filled with black helmets, a yellow canister, and other objects. The rifle he is holding is black and appears to be an assault rifle. The scene suggests a police storage or armory area. The location is identified as Tanakawu, Indonesia.

A man in a tan police uniform with a black beret holds a rifle. The man has a dark complexion, short dark hair, and is looking forward with a neutral expression. He is wearing a name tag that reads "SAPOAN AR" and a badge on his uniform. The man is standing in a room with yellow walls. To his left is a metal cabinet with drawers, and a window with metal bars. To his right are shelves filled with black helmets, a yellow canister, and other objects. The rifle he is holding is black and appears to be an assault rifle. The scene suggests a police storage or armory area. The location is identified as Tanakawu, Indonesia.

Tanakawu
In Tanakawu, Indonesia, an individual is depicted pouring green liquid from a glass bottle into the fuel tank of a red scooter using a black funnel. The individual is wearing a black t-shirt and a sarong with a vertical striped pattern in black, green, and purple. The scooter's storage compartment beneath the seat is visible, containing a plastic bag filled with what appears to be shoes. In the background, a street scene unfolds with a yellow line dividing the road, and two individuals on a red motorcycle are seen riding away. The ground surface is a mix of concrete and asphalt.

In Tanakawu, Indonesia, an individual is depicted pouring green liquid from a glass bottle into the fuel tank of a red scooter using a black funnel. The individual is wearing a black t-shirt and a sarong with a vertical striped pattern in black, green, and purple. The scooter's storage compartment beneath the seat is visible, containing a plastic bag filled with what appears to be shoes. In the background, a street scene unfolds with a yellow line dividing the road, and two individuals on a red motorcycle are seen riding away. The ground surface is a mix of concrete and asphalt.

Tanakawu