Sign in
The image shows a partially constructed road in Enugu, Nigeria. The road surface is unpaved with visible tire tracks. A concrete drainage system borders the road, showing signs of recent construction with dirt piles along the edges. Several houses are visible behind the road, separated by a white fence. An electrical pole stands on the left side of the road. Overhead are power lines against a cloudy sky.
F
FM-ppriW2

May 31, 2026, 7:01 AM

Enugu, Nigeria

Moment

Stake attention in this memory

hopeful
calm
contrasting
neutral
anticipation

The image shows a partially constructed road in Enugu, Nigeria. The road surface is unpaved with visible tire tracks. A concrete drainage system borders the road, showing signs of recent construction with dirt piles along the edges. Several houses are visible behind the road, separated by a white fence. An electrical pole stands on the left side of the road. Overhead are power lines against a cloudy sky.

Symbol

014A1

Volume

2,861

Creator

+$0.00

Revenue

+$0.00

TVL

$0.22

1D
1W
1M
All

Loading AttnAds…

transactions
revenues
stakers
Earliest
Latest
Highest stake

1

FM-ppriW2

Staked 1mo ago

$0.22 USD

$0.00 USD

0%

More from this user

More from Enugu

FFM-ppriW2

May 31, 2026, 7:01 AM

Enugu, Nigeria

Licensed under Creative Commons Attribution 4.0 International License. You are free to share and adapt this content with proper attribution.