Sign in
An indoor construction site in Zielona Góra, Poland, is depicted. The scene features a concrete floor with various construction materials scattered around. In the foreground, a black plastic tool case is open, revealing plumbing tools, including what appears to be a crimping tool with orange handles, several fittings of different colors (black, blue, green), and a red cap. A yellow electrical cable runs across the floor towards the left side of the frame. In the background, plumbing pipes (red and blue) are visible emerging from a wall on the left. A tripod with a camera or light is positioned in the mid-ground, facing a wall. Further back, a white bucket and a coil of white tubing are present. The walls of the room are bare and unfinished. Sunlight streams in from a window on the right, casting shadows across the floor. The overall impression is that of an active construction or renovation project.
FM-dtHvw2

Jun 18, 2026, 3:00 PM

Zielona Góra, Poland

Moment

Stake attention in this memory

anticipation
progress
preparedness
potential
work in progress

An indoor construction site in Zielona Góra, Poland, is depicted. The scene features a concrete floor with various construction materials scattered around. In the foreground, a black plastic tool case is open, revealing plumbing tools, including what appears to be a crimping tool with orange handles, several fittings of different colors (black, blue, green), and a red cap. A yellow electrical cable runs across the floor towards the left side of the frame. In the background, plumbing pipes (red and blue) are visible emerging from a wall on the left. A tripod with a camera or light is positioned in the mid-ground, facing a wall. Further back, a white bucket and a coil of white tubing are present. The walls of the room are bare and unfinished. Sunlight streams in from a window on the right, casting shadows across the floor. The overall impression is that of an active construction or renovation project.

Symbol

1C22D

Volume

7,198

Creator

+$0.00

Revenue

+$0.00

TVL

$0.92

1D
1W
1M
All

Loading AttnAds…

transactions
revenues
stakers
Earliest
Latest
Highest stake

1

FM-dtHvw2

Staked 26d ago

$0.20 USD

$0.00 USD

0%

2

FM-dtHvw2

Staked 25d ago

$0.72 USD

$0.00 USD

0%

More from this user

More from Zielona Góra

FM-dtHvw2

Jun 18, 2026, 3:00 PM

Zielona Góra, Poland

Licensed under Creative Commons Attribution 4.0 International License. You are free to share and adapt this content with proper attribution.