Sign in
The image depicts an active construction site in Barakin Lerawi, Nigeria, under clear daylight conditions. In the foreground, a dark-skinned male, wearing an olive green sleeveless shirt and dark trousers, is seated on a stack of eight light gray hollow concrete blocks. He is seen from behind, leaning forward, holding a shovel with his right hand. To his right, a second dark-skinned male, wearing a white short-sleeved shirt, is bent over, facing away, actively shoveling reddish-brown earth into a black bucket.

The ground consists of unpaved, dry, reddish-brown earth, with scattered smaller rocks and debris. Adjacent to the second worker are piles of construction materials: a mound of mixed dark gray-brown material (likely cement/mortar), a larger pile of reddish-brown earth, and further right, a substantial pile of light brown sand. A shovel stands upright in the dark gray-brown mound.

In the mid-ground, a long, newly constructed or under-construction building extends horizontally across the frame. This single-story structure features light-colored walls (some appearing as raw concrete block, others painted light cream or yellow), dark gray fascia or roof trim, and multiple rectangular windows, some with security grates. Several white satellite dishes are visible mounted along the roofline. A trench or excavation runs parallel to the building on the far left side. The sky is bright blue with a slight haze.
FM-qJFeR2

Nov 24, 2025, 12:40 PM

Barakin Lerawi, Nigeria

Stake attention in this memory

Labor
Industry
Construction
Resilience
Hope

The image depicts an active construction site in Barakin Lerawi, Nigeria, under clear daylight conditions. In the foreground, a dark-skinned male, wearing an olive green sleeveless shirt and dark trousers, is seated on a stack of eight light gray hollow concrete blocks. He is seen from behind, leaning forward, holding a shovel with his right hand. To his right, a second dark-skinned male, wearing a white short-sleeved shirt, is bent over, facing away, actively shoveling reddish-brown earth into a black bucket. The ground consists of unpaved, dry, reddish-brown earth, with scattered smaller rocks and debris. Adjacent to the second worker are piles of construction materials: a mound of mixed dark gray-brown material (likely cement/mortar), a larger pile of reddish-brown earth, and further right, a substantial pile of light brown sand. A shovel stands upright in the dark gray-brown mound. In the mid-ground, a long, newly constructed or under-construction building extends horizontally across the frame. This single-story structure features light-colored walls (some appearing as raw concrete block, others painted light cream or yellow), dark gray fascia or roof trim, and multiple rectangular windows, some with security grates. Several white satellite dishes are visible mounted along the roofline. A trench or excavation runs parallel to the building on the far left side. The sky is bright blue with a slight haze.

Loading AttnAds…

transactions
revenues
stakers
Earliest
Latest
Highest stake

No transactions found

More from this user

More from Barakin Lerawi

FM-qJFeR2

Nov 24, 2025, 12:40 PM

Barakin Lerawi, Nigeria

Licensed under Creative Commons Attribution 4.0 International License. You are free to share and adapt this content with proper attribution.