Sign in
A street-level, medium shot captures a cloudy sky with dramatic cumulus clouds over a suburban landscape in Solikamsk, Russia. In the foreground, a dirt road curves to the right, with patches of dry grass and scattered litter along its edge. A construction sign, predominantly yellow with black lettering, stands prominently on two yellow and black striped posts. The sign reads "СТРОИТЕЛЬСТВО" (Construction) and provides details about the project, including its location "o.d. проспект Юбилейный (от ул. Крылова до ул. Матросова) 1 этап ПК6+00-ПК6+13" (Yubileyny Avenue (from Krylova Street to Matrosova Street) Stage 1 PK6+00-PK6+13). It also lists the client as MBU "URSSI", the contractor as OOO "SK "Khimstroy", and the project manager as Tarasov D.V., with contact information. The construction period is stated as 01.08.2026 - 31.12.2026.

To the left of the sign, a multi-story apartment building with a grey facade and balconies is visible. Behind the construction sign and stretching across the midground is a dense strip of green grass and trees. In the background, on the right side of the image, a modern, white-faced building stands next to a cell tower. A yellow construction vehicle, possibly a backhoe, is parked amongst the foliage. A blue parking sign with a white 'P' is also visible near the construction vehicle. The overall scene suggests an ongoing development project in a residential area.
Nata

Jun 21, 2026, 12:42 PM

Solikamsk, Russia

Stake attention in this memory

anticipation
melancholy
hopeful
calm
curiosity

A street-level, medium shot captures a cloudy sky with dramatic cumulus clouds over a suburban landscape in Solikamsk, Russia. In the foreground, a dirt road curves to the right, with patches of dry grass and scattered litter along its edge. A construction sign, predominantly yellow with black lettering, stands prominently on two yellow and black striped posts. The sign reads "СТРОИТЕЛЬСТВО" (Construction) and provides details about the project, including its location "o.d. проспект Юбилейный (от ул. Крылова до ул. Матросова) 1 этап ПК6+00-ПК6+13" (Yubileyny Avenue (from Krylova Street to Matrosova Street) Stage 1 PK6+00-PK6+13). It also lists the client as MBU "URSSI", the contractor as OOO "SK "Khimstroy", and the project manager as Tarasov D.V., with contact information. The construction period is stated as 01.08.2026 - 31.12.2026. To the left of the sign, a multi-story apartment building with a grey facade and balconies is visible. Behind the construction sign and stretching across the midground is a dense strip of green grass and trees. In the background, on the right side of the image, a modern, white-faced building stands next to a cell tower. A yellow construction vehicle, possibly a backhoe, is parked amongst the foliage. A blue parking sign with a white 'P' is also visible near the construction vehicle. The overall scene suggests an ongoing development project in a residential area.

Loading AttnAds…

transactions
revenues
stakers
Earliest
Latest
Highest stake

No transactions found

More from this user

More from Solikamsk

Nata

Jun 21, 2026, 12:42 PM

Solikamsk, Russia

Licensed under Creative Commons Attribution 4.0 International License. You are free to share and adapt this content with proper attribution.