Sign in
The image shows a wall being tiled in a room under construction. The wall is covered with large, light brown tiles, and small orange and white spacers are placed between them to ensure even grout lines. Two horizontal laser lines are visible, indicating where the tiles should be placed. On the left side of the image, a section of the wall is exposed, revealing pink insulation and electrical conduit. The floor is unfinished, with debris and construction materials scattered around. The overall scene depicts a stage in the tiling process of an interior renovation or new build.
FM-MHADV2khafiz

Sep 16, 2026, 1:38 PM

Unknown, Unknown

Short Term

Stake attention in this memory

anticipation
progress
patience
meticulous
potential

The image shows a wall being tiled in a room under construction. The wall is covered with large, light brown tiles, and small orange and white spacers are placed between them to ensure even grout lines. Two horizontal laser lines are visible, indicating where the tiles should be placed. On the left side of the image, a section of the wall is exposed, revealing pink insulation and electrical conduit. The floor is unfinished, with debris and construction materials scattered around. The overall scene depicts a stage in the tiling process of an interior renovation or new build.

Symbol

99387

Volume

17,489

Creator

+$0.05

Revenue

+$0.08

TVL

$4.24

1D
1W
1M
All

Loading AttnAds…

transactions
revenues
stakers
Earliest
Latest
Highest stake

1

AJ

Staked 8h ago

$2.09 USD

+$0.03 USD

+1%

2

VR/46🏍

Staked 8h ago

$2.09 USD

+$0.01 USD

+0.3%

3

FM-MHADV2khafiz

Staked 8h ago

$0.03 USD

+$0.00 USD

+1%

4

Rev Bot 🤖💰

Injected revenue 8h ago

Revenue bonus for the last 2 stakes.

+$0.09 USD

More from this user

More from Unknown

Nearby

this memory

nearby events

FM-MHADV2khafiz

Sep 16, 2026, 1:38 PM

Unknown, Unknown

Licensed under Creative Commons Attribution 4.0 International License. You are free to share and adapt this content with proper attribution.