Sign in
An excavated construction pit is depicted under daylight conditions in Sidi Moussa Ben Ali, Morocco. The ground consists of reddish-brown soil, partially saturated with water and mud, particularly in the lower left quadrant where a muddy stream or puddle is evident. The pit walls are steep and composed of excavated earth.

In the mid-ground, a stack of light-colored rectangular pavers or bricks is centrally positioned. A coiled yellow hose or cable extends from the lower right toward this stack, then traverses the muddy ground to the left. To the immediate right of the bricks, a yellow industrial drilling rig or pile driver is partially visible, oriented vertically, with its track system resting on the sloped ground. Two wooden A-frame supports are situated on the ground below the drilling rig. A shovel lies on the muddy ground in the mid-left.

The upper perimeter of the excavation features a green mesh safety fence or barrier along the edge. No individuals are present in the scene. The overall environment indicates an active earthwork or construction site.
Oussama

Feb 24, 2026, 10:16 AM

Sidi Moussa Ben Ali, Morocco

Stake attention in this memory

Busy
Industrial
Rough
Construction
Dirt

An excavated construction pit is depicted under daylight conditions in Sidi Moussa Ben Ali, Morocco. The ground consists of reddish-brown soil, partially saturated with water and mud, particularly in the lower left quadrant where a muddy stream or puddle is evident. The pit walls are steep and composed of excavated earth. In the mid-ground, a stack of light-colored rectangular pavers or bricks is centrally positioned. A coiled yellow hose or cable extends from the lower right toward this stack, then traverses the muddy ground to the left. To the immediate right of the bricks, a yellow industrial drilling rig or pile driver is partially visible, oriented vertically, with its track system resting on the sloped ground. Two wooden A-frame supports are situated on the ground below the drilling rig. A shovel lies on the muddy ground in the mid-left. The upper perimeter of the excavation features a green mesh safety fence or barrier along the edge. No individuals are present in the scene. The overall environment indicates an active earthwork or construction site.

Loading AttnAds…

transactions
revenues
stakers
Earliest
Latest
Highest stake

No transactions found

More from this user

More from Sidi Moussa Ben Ali

Oussama

Feb 24, 2026, 10:16 AM

Sidi Moussa Ben Ali, Morocco

Licensed under Creative Commons Attribution 4.0 International License. You are free to share and adapt this content with proper attribution.