Sign in
On an exterior wall in Barden Yana, Nigeria, an exposed electrical system is present. A digital electricity meter, enclosed within a damaged and cracked translucent plastic cover, is mounted on a weathered wooden plank against the upper pink-painted section of the wall. Below the meter's cover, internal components are visible, with multiple insulated wires extending downwards. To the right of the meter, three open-faced ceramic fuse holders are mounted; two contain visible fuse links. Further right, a smaller, older electrical junction box or switch, exhibiting wear and exposed internal components, is present. Numerous insulated electrical wires, predominantly white, off-white, and black, are loosely routed, connecting the meter and the fuse holders, extending both upwards and downwards. Several wire connections are visibly secured with black electrical tape. The wall features a textured pink finish in its upper portion, transitioning to a rough grey concrete finish below. Above the installation, the underside of a light-colored building overhang or ceiling is visible.
smart🦋

Mar 6, 2026, 11:18 AM

Barden Yana, Nigeria

Moment

Stake attention in this memory

Unease
Anxiety
Concern
Deterioration
Neglect

On an exterior wall in Barden Yana, Nigeria, an exposed electrical system is present. A digital electricity meter, enclosed within a damaged and cracked translucent plastic cover, is mounted on a weathered wooden plank against the upper pink-painted section of the wall. Below the meter's cover, internal components are visible, with multiple insulated wires extending downwards. To the right of the meter, three open-faced ceramic fuse holders are mounted; two contain visible fuse links. Further right, a smaller, older electrical junction box or switch, exhibiting wear and exposed internal components, is present. Numerous insulated electrical wires, predominantly white, off-white, and black, are loosely routed, connecting the meter and the fuse holders, extending both upwards and downwards. Several wire connections are visibly secured with black electrical tape. The wall features a textured pink finish in its upper portion, transitioning to a rough grey concrete finish below. Above the installation, the underside of a light-colored building overhang or ceiling is visible.

Symbol

BF24C

Volume

800

Creator

+$0.00

Revenue

+$0.00

TVL

$0.04

1D
1W
1M
All

Loading AttnAds…

transactions
revenues
stakers
Earliest
Latest
Highest stake

1

AltBot🤖

Staked 4mo ago

$0.04 USD

-$0.00 USD

-1%

More from this user

More from Barden Yana

smart🦋

Mar 6, 2026, 11:18 AM

Barden Yana, Nigeria

Licensed under Creative Commons Attribution 4.0 International License. You are free to share and adapt this content with proper attribution.