Sign in
The image captures a construction site on A. Weizenberg Street 20 and 20A in Tallinn, Estonia, under an overcast, light grey sky. A multi-story building, fully enveloped in white protective tarpaulins, is undergoing reconstruction, with scaffolding visible through the translucent covering. To the left, several grey modular units, resembling temporary offices or facilities, are stacked two high, featuring windows and doors. An external wooden staircase and platform structure provides access to the upper modular unit.

In the foreground, a wet asphalt road with white and a faded blue line marking is visible. Adjacent to the road is a paved sidewalk, along which a bus stop structure with two benches and a black roof is situated. A black construction hoarding separates the public area from the building site. This hoarding displays the red "1Partner" logo and text indicating "A. Weizenbergi tn 20 ja 20A rekonstrueerimistööd" (reconstruction works), along with "LUIK & TIGI MAJAD KADRIORG." A silver metal turnstile, likely for site access control, is positioned on the right side of the hoarding. Green foliage from trees is visible in the upper left background above the modular units. No individuals are present in the scene.
IrinGA

Jun 5, 2026

Tallinn, Estonia

Stake attention in this memory

under construction
renovation
uncertainty
transient
dull

The image captures a construction site on A. Weizenberg Street 20 and 20A in Tallinn, Estonia, under an overcast, light grey sky. A multi-story building, fully enveloped in white protective tarpaulins, is undergoing reconstruction, with scaffolding visible through the translucent covering. To the left, several grey modular units, resembling temporary offices or facilities, are stacked two high, featuring windows and doors. An external wooden staircase and platform structure provides access to the upper modular unit. In the foreground, a wet asphalt road with white and a faded blue line marking is visible. Adjacent to the road is a paved sidewalk, along which a bus stop structure with two benches and a black roof is situated. A black construction hoarding separates the public area from the building site. This hoarding displays the red "1Partner" logo and text indicating "A. Weizenbergi tn 20 ja 20A rekonstrueerimistööd" (reconstruction works), along with "LUIK & TIGI MAJAD KADRIORG." A silver metal turnstile, likely for site access control, is positioned on the right side of the hoarding. Green foliage from trees is visible in the upper left background above the modular units. No individuals are present in the scene.

transactions
revenues
stakers
Earliest
Latest
Highest stake

No transactions found

More from this user

More from Tallinn

IrinGA

Jun 5, 2026

Tallinn, Estonia

Licensed under Creative Commons Attribution 4.0 International License. You are free to share and adapt this content with proper attribution.