Sign in
The image depicts an indoor construction or setup scene in Baku City, Azerbaijan. Two individuals, dressed in dark clothing, are actively engaged in assembling or disassembling large, black electronic equipment, likely speakers or display panels, arranged in stacks. One person is positioned on the left, bent over near a large wall of vertically aligned panels, while the other is on the right, also working with the stacked equipment. The environment appears to be a large, sparsely furnished space with a neutral-toned, textured wall as the backdrop. Overhead, elaborate lighting fixtures with multiple glass globes are visible, suggesting a venue or performance space. In the foreground, a coiled bundle of cables and a cordless drill resting on a paper cup indicate ongoing work. A bottle of water is also present on the floor in the lower right corner. The overall impression is one of logistical setup or preparation for an event.
M.M.A

Jun 20, 2026

Baku City, Azerbaijan

Moment

Stake attention in this memory

Focused
Dedicated
Constructing
Teamwork
Prepping

The image depicts an indoor construction or setup scene in Baku City, Azerbaijan. Two individuals, dressed in dark clothing, are actively engaged in assembling or disassembling large, black electronic equipment, likely speakers or display panels, arranged in stacks. One person is positioned on the left, bent over near a large wall of vertically aligned panels, while the other is on the right, also working with the stacked equipment. The environment appears to be a large, sparsely furnished space with a neutral-toned, textured wall as the backdrop. Overhead, elaborate lighting fixtures with multiple glass globes are visible, suggesting a venue or performance space. In the foreground, a coiled bundle of cables and a cordless drill resting on a paper cup indicate ongoing work. A bottle of water is also present on the floor in the lower right corner. The overall impression is one of logistical setup or preparation for an event.

Symbol

DA8A5

Volume

8,372

Creator

+$0.15

Revenue

+$0.26

TVL

$11.91

1D
1W
1M
All
transactions
revenues
stakers
Earliest
Latest
Highest stake

1

Mimi

Staked 2h ago

$11.77 USD

+$0.15 USD

+1%

2

Rev Bot 🤖💰

Injected revenue 2h ago

Revenue bonus for the last stake.

+$0.29 USD

More from this user

More from Baku City

M.M.A

Jun 20, 2026

Baku City, Azerbaijan

Licensed under Creative Commons Attribution 4.0 International License. You are free to share and adapt this content with proper attribution.