
Stake attention in this memory
The image depicts an electrical control panel, likely for a pumping system, situated in a dimly lit environment. The panel is a light gray color with a label "TABLERO BOMBAS" (Pump Panel) in Spanish. Three red indicator lights labeled "R", "S", and "T" are illuminated on the left side of the panel. Below the lights are labeled buttons, including "FALLA BOMBA 1" (Pump 1 Failure), "ENCENDIDO BOMBA 1" (Pump 1 On), "FALLA BOMBA 2" (Pump 2 Failure), and "ENCENDIDO BOMBA 2" (Pump 2 On). Two green indicator lights are illuminated for "ENCENDIDO BOMBA 1" and "ENCENDIDO BOMBA 2". A switch allows the system to be operated automatically or manually ("AUTOMATICO" and "MANUAL"). The panel is mounted near a series of dark, horizontal, possibly bundled cables. There is no indication of people or a specific location in Buenos Aires, Argentina.
Symbol
EA1A2
Volume
0
Creator
+$0.00
Revenue
+$0.00
TVL
$0.00
Loading AttnAds…
2
Rev Bot 🤖💰
Injected revenue 1mo ago
“Revenue bonus for the last stake.”
+$0.00 USD

